Transportation & Installation
The process of making products available for use in the supply chain process consists of three basic stages. It is then ready for immediate use.
Transportation
The product is loaded onto the delivery vehicle (standart semi-trailer; 13,5m, width: >= 3m, height.<=4,2m) and shipped with a flat-rack container.
Hoisting
Upon arrival, the product is lifted with a crane. At this stage, process support is provided remotely by our technicians through guidance services. The product weighs between 6 and 10 tons and cranes with a capacity of >=25 tons should be used for lifting
Installation
Before installation, the foundation, plumbing system, and electrical system are according to the standart drawing provided by our technicians, and then the product is placed.
Lifting and Loading
Safe and careful lifting and loading operation
Caution During Transportation
High precautions for minimum risk
Fixing and Packing
Appropriate securing and packaging to prevent damage during transportation.
Product Delivery
30 - 60 Days Production Cycle Timely and secure delivery
Pre-Shipment Inspection
Professional inspection related to quality, quantity and marking
Models
Futuristic & Innovative Designs
In 2022, I-Cons entered the industry with ambitious and solid steps, aiming to change traditional standards and become one of the pioneers of this change. In this period where te socio-cultural structures of societies are diversifying, we aim to create alternative living spaces to ordinay lifestyles with oır innovative product designs.